Free Daily Analysis

Stock Trend Analysis Report

Prepared for you on Wednesday, March 25, 2026.

Webster Financial Corporation (NYSE:WBS)

Bull Market Weakness (+75) - WBS is showing signs of short-term weakness, but still remains in the confines of a long-term uptrend. Keep an eye on WBS as it may be in the beginning stages of a reversal.

Is it time to buy, sell, or avoid WBS?

MarketClub looks at technical strength and momentum to determine if the timing is right for WBS.

Learn more about the Trade Triangles and how we make technical analysis as easy as buy and sell.

NYSE_WBS
Open High Low WBS Price Change
69.430 69.670 69.070 69.455 +0.785
Entry Signal

MarketClub’s Trade Triangles for WBS

long term up The long-term trend has been UP since Dec 9th, 2025 at 63.59

intermediate term down The intermediate-term trend has been DOWN since Mar 3rd, 2026 at 70.89

short term up The short-term trend has been UP since Mar 23rd, 2026 at 68.94

Smart Scan Analysis for WBS

Based on our trend formula, WBS is rated as a +75 on a scale from -100 (Strong Downtrend) to +100 (Strong Uptrend).

+75
Smart Scan Analysis for WBS
Strong Downtrend Sideways Strong Uptrend
Open High Low Price Change
69.430 69.670 69.070 69.455 +0.785
Prev. Close Volume Bid Ask Time
68.670 1804882 2026-03-25 15:59:37
Year High69.63Year High Date2018-07-23
Year Low51.69Year Low Date2018-02-09
52wk High7452wk High Date2026-02-25
52wk Low39.4352wk Low Date2025-04-04
Year End Close20.55Average Volume5,642,823
Shares Outstanding161,227Short Interest3,224,373
% Institutional86.2Assets840,736,630M
Liabilities745,814,270MP/E Ratio11.639
Beta1.73Volatility30.08
Get a free daily analysis and signals for Webster Financial Corporation (WBS) - Request Your Free Report.